Sponsored Development: Libero Warehouse Management

From ADempiere
Revision as of 15:34, 24 July 2009 by Goanookie (Talk) (Detail Use-Case Scenarios)

Jump to: navigation, search
This Wiki is read-only for reference purposes to avoid broken links.

The Design Project is based in Unified Process Methodology

Roles

  • Analyst
  • Any Role
  • Architect
  • Developer
  • Project Manager
  • Stakeholder
  • Tester

Tasks

Develop Vision

Vision Document

Identify Stakeholders Ok

  • Warehouse Man
  • Planner Shipment
  • Planner Production
  • Production Manager
  • Customer Services
  • Customer
  • Implementor

Gain agreement on the problem to be solved

The problem that need be to solve are:

  • Problem the in Picking process
  • Problem the in Packing process
  • Problem the in Shipment process
  • Problem the excess of the stock
  • Ineficciences the time lost for searching product in warehouse
  • Inefficiencies do to lack picking route planning
  • Problem to entry data the transaction manually

Gather stakeholder requests

  • Optimize the Shipment Plan
  • Optimize the Picking process
  • Optimize the Packing process
  • Optimize the Shipment process
  • Optimize the Stock Inventory
  • Optimize the time to locate the product in warehouse
  • Optimize the picking route planning
  • Optimize the entry data and report of the Inventory transaction via scanner bar code

Define the scope of the solution

The first intention of this project is create the basic functionality to solve the main issue with picking , packing and shipment process, So in this moment the fist version of this functionality will be:

  • Create and Processing the Shipment Plan
  • Picking Management
  • Packing Management
  • Allocation Material Management
  • Scanner Barcode Automatization outbound process

Second stage

  • Travel Sequences
  • Putaway Management
  • Quick Material receipt
  • Complex Rules to Picking and Putaway process

Define features of the system

  • Creating Picking Document based in rules
  • Simulation of fulfillment success by various criteria
    • Customer
    • Order number/type
    • Date ordered/promised
    • Shipment destination
    • Product/category
    • Postal Code
    • Shipper
  • Specific order line selection
  • Release Picking Document by orders or order lines
  • Prioritize release
  • Flexible sort criteria
  • Override shipping rules
  • Disallow negative inventory
  • Shipping label generation
  • Consolidation of shipments
  • Allocation Material
  • Packing and Palletization
  • Immediately create supply to Material do not available (Assamble To Order)

Achieve concurrence

Capture a common vocabulary

Identify and Outline Requirements

Detail Use-Case Scenarios

600x

Detail System-Wide Requirements

Implementation

Entity Relationship Model

WarehouseManagementERM.png

Area Type

The Warehouse Area Type define Warehouse Area by space used , warehuse thecnique, warehouse function

Bulk Open High Rack Picking Area Shefl Storage etc

WMAreaType.png

Section Type

WMSectionType.png

Warehouse Structure

WMStructureList.png

WMArea.png

WMSection.png

Inbound & Outbound Rule

WMRule.png

Inbound & Outbound Strategy

WMStrategyList.png


WMStrategy.png

Inbound & Outbound Definition

WMDefinitionList.png

WMDefinition.png

WMDefinitionSort.png