Difference between revisions of "FT/TT meeting minutes Jan 13th 2011"
From ADempiere
This Wiki is read-only for reference purposes to avoid broken links.
m (removed double "then") |
|||
(3 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
#General: | #General: | ||
− | #*Participants: Mario, Teo, Karsten, Ramiro | + | #*Moderator: Mark |
− | #*Missing: Michael, Paul, Kai, | + | #*Participants: Mario, Teo, Karsten, Ramiro, Trifon, Victor |
+ | #*Missing: Michael, Paul, Kai | ||
+ | # Organisation of Repository Switch from SVN to Mercurial: | ||
+ | #* Mirror Repository, Zip Repository, Download possibility of SVN trunk. Then drop SVN Repository on 1st February 2011. Functional Team will organise a Switch Day "Trunk" on wednesday 19th of January 2011 from 08:00h GMT (for Europe, Asia, Australia) and 14:00h GMT (for America). | ||
+ | #* The timeframe for contribs/ other branches is 4 months, until 1st May 2011. Then Mirror, Zip, Download possibility of these too then drop on 1st May 2011. Functional Team will organise a Switch Day "Branches" on wednesday 20th of April 2011 from 08:00h GMT (for Europe, Asia, Australia) and 14:00h GMT (for America). | ||
+ | #* Q&A, Functional Team will answer requests with a fair reponse time for community members about migration questions. | ||
+ | #* Reorganisation of Functional/ Technical Group Entry Page (Transparent Organisation of Group announcements/ informations) | ||
+ | #* Mark prepares a text for steps mentioned above and Tobi fills in details. Ramiro will announce in main wiki page. | ||
+ | # Next meeting | ||
+ | #*We will meet next on Thursday, January 20th, 2011 at the same time (15:00 hours GMT) | ||
+ | #*Teo will moderate the next Meeting |
Latest revision as of 05:34, 17 January 2011
- General:
- Moderator: Mark
- Participants: Mario, Teo, Karsten, Ramiro, Trifon, Victor
- Missing: Michael, Paul, Kai
- Organisation of Repository Switch from SVN to Mercurial:
- Mirror Repository, Zip Repository, Download possibility of SVN trunk. Then drop SVN Repository on 1st February 2011. Functional Team will organise a Switch Day "Trunk" on wednesday 19th of January 2011 from 08:00h GMT (for Europe, Asia, Australia) and 14:00h GMT (for America).
- The timeframe for contribs/ other branches is 4 months, until 1st May 2011. Then Mirror, Zip, Download possibility of these too then drop on 1st May 2011. Functional Team will organise a Switch Day "Branches" on wednesday 20th of April 2011 from 08:00h GMT (for Europe, Asia, Australia) and 14:00h GMT (for America).
- Q&A, Functional Team will answer requests with a fair reponse time for community members about migration questions.
- Reorganisation of Functional/ Technical Group Entry Page (Transparent Organisation of Group announcements/ informations)
- Mark prepares a text for steps mentioned above and Tobi fills in details. Ramiro will announce in main wiki page.
- Next meeting
- We will meet next on Thursday, January 20th, 2011 at the same time (15:00 hours GMT)
- Teo will moderate the next Meeting