Difference between revisions of "FT/TT meeting minutes Jan 13th 2011"

From ADempiere
Jump to: navigation, search
This Wiki is read-only for reference purposes to avoid broken links.
(Created page with ':')
 
m (removed double "then")
 
(4 intermediate revisions by one other user not shown)
Line 1: Line 1:
:
+
#General:
 +
#*Moderator: Mark
 +
#*Participants: Mario, Teo, Karsten, Ramiro, Trifon, Victor
 +
#*Missing: Michael, Paul, Kai
 +
# Organisation of Repository Switch from SVN to Mercurial:
 +
#* Mirror Repository, Zip Repository, Download possibility of SVN trunk. Then drop SVN Repository on 1st February 2011. Functional Team will organise a Switch Day "Trunk" on wednesday 19th of January 2011 from 08:00h GMT (for Europe, Asia, Australia) and 14:00h GMT (for America).
 +
#* The timeframe for contribs/ other branches is 4 months, until 1st May 2011. Then Mirror, Zip, Download possibility of these too then drop on 1st May 2011. Functional Team will organise a Switch Day "Branches" on wednesday 20th of April 2011 from 08:00h GMT (for Europe, Asia, Australia) and 14:00h GMT (for America).
 +
#* Q&A, Functional Team will answer requests with a fair reponse time for community members about migration questions.
 +
#* Reorganisation of Functional/ Technical Group Entry Page (Transparent Organisation of Group announcements/ informations)
 +
#* Mark prepares a text for steps mentioned above and Tobi fills in details. Ramiro will announce in main wiki page.
 +
# Next meeting
 +
#*We will meet next on Thursday, January 20th, 2011 at the same time (15:00 hours GMT)
 +
#*Teo will moderate the next Meeting

Latest revision as of 05:34, 17 January 2011

  1. General:
    • Moderator: Mark
    • Participants: Mario, Teo, Karsten, Ramiro, Trifon, Victor
    • Missing: Michael, Paul, Kai
  2. Organisation of Repository Switch from SVN to Mercurial:
    • Mirror Repository, Zip Repository, Download possibility of SVN trunk. Then drop SVN Repository on 1st February 2011. Functional Team will organise a Switch Day "Trunk" on wednesday 19th of January 2011 from 08:00h GMT (for Europe, Asia, Australia) and 14:00h GMT (for America).
    • The timeframe for contribs/ other branches is 4 months, until 1st May 2011. Then Mirror, Zip, Download possibility of these too then drop on 1st May 2011. Functional Team will organise a Switch Day "Branches" on wednesday 20th of April 2011 from 08:00h GMT (for Europe, Asia, Australia) and 14:00h GMT (for America).
    • Q&A, Functional Team will answer requests with a fair reponse time for community members about migration questions.
    • Reorganisation of Functional/ Technical Group Entry Page (Transparent Organisation of Group announcements/ informations)
    • Mark prepares a text for steps mentioned above and Tobi fills in details. Ramiro will announce in main wiki page.
  3. Next meeting
    • We will meet next on Thursday, January 20th, 2011 at the same time (15:00 hours GMT)
    • Teo will moderate the next Meeting